Address:
Ufa,
23 H. Davletshinoy st.
Рус En Ir
+7 (347) 253 87 13 Opening hours:
Mon-Fri from 09:00 to 18:00 (UTS/GMT+5)
Request a call

PROCESSING UNIT CONDUCTING (Conducting Block – CB)

 PROCESSING UNIT CONDUCTING (Conducting Block – CB)

CB purpose - is measuring the flow-rate gas wells, gas flow control, switch-off the wells in emergency on pipe, switching the gas flow from the well to the torch, feeding and control after the methanol flow. Real destination - for gas and gas condensate wells. CB Constructive solution enables quick installation and implementation of the equipment into the Deposit pipeline system.

If you have questions , leave a request:




CB purpose - is measuring the flow-rate gas wells, gas flow control, switch-off the wells in  emergency on pipe, switching the gas flow from the well to the torch, feeding and control after the methanol flow. Real destination - for gas and gas condensate wells.

CB Constructive solution enables quick installation and implementation of the equipment into the Deposit pipeline system.

Twins CB enables to reduce spending for construction and installation works, because twins CB could be placing on the one-pillar foundation platform .

CB is easy into operation. It makes possible make control after 2 wells, as well as methanol supplying to prevent hydrate plugs appears.

CB could be automatically operated from the remote control. Monitoring of the wells working will be realized from the control panel.

The company also proposes to equip the CB Unit with the multi-cyclone filter series HCCF. This filter is for purifying raw gas from produced water and mechanical impurities.

Основное фото.JPG




back to the list